We took out the carpeting and had the asbestos floor tiles
professionally removed.
Pictured: Bob Goodwin
.jpg/:/cr=t:12.5%25,l:0%25,w:100%25,h:75%25/rs=w:388,h:388,cg:true)
There were numerous cracks
in the plaster.


Repairing the cracks in the plaster.
Pictured: Bruce Altmann

We painted the sanctuary and narthex white in keeping with how
Congregational Churches are
historically painted.
Pictured: Cathy Cawiezel

Solid oak flooring staged to be installed in April 2023

We searched for and acquired pews similar in color to the original pews. We found the "new to us pews" in Texas.
We wish we could find
some of the original pews.

We had the pews professionally
cut to size.
Pictured: Stephanie and Brian Walsh

The pews will be installed after the flooring is in place.
Pictured:
Brian Walsh, Cathy Cawiezel, Bill Smith

We removed dated and water damaged cabinetry from the kitchen.
Pictured: Jim Fousek and Bill Smith

The plaster board in the kitchen had water damage and needs repair and painting.
We've acquired a new stainless steel commercial sink and work tables from
Gator Chef here in Lisle

We have removed the drop ceiling to open up the space and will replace the can lighting with surface mounted LED lights.

We have significant plumbing and electrical work to do!

Plumbing repairs needed in the kitchen


Cathy Cawiezel, Wayne Dunham, and
Bill Smith are the Heritage Society members who are leading the
preservation project.
Pictured: Wayne Dunham